Building the foundations
of tomorrow
“To lay strong foundations -
both in concrete and in character - guided by faith, integrity, and a passion for quality, as we serve others with excellence and reflect the hope and future promised in Jeremiah 29:11.”
28
years of building
HR Marc Company is a trusted commercial concrete subcontractor based in Pflugerville, Texas, serving the greater Austin area. Since 1998, we’ve built a reputation for quality, precision, and reliability—delivering durable results and strong partnerships on every project. As a certified Women’s Business Enterprise (WBE), we’re committed to excellence, integrity, and supporting the communities we build in.
Core Capabilities
Chase Bank Parmer Ranch | Georgetown, Texas
General Contractor: Embree Construction Group, Inc.
HR Marc completed the site concrete package for this ground-up commercial banking project, including a 3,340-square-foot slab-on-grade foundation, 13,500 square feet of 6-inch concrete paving, 12,200 square feet of 7-inch concrete paving, and 2,200 square feet of sidewalks. The project also included the installation of monolithic curb, ADA-compliant ramps, light pole bases, a dumpster pad, a transformer pad, bollards, gate posts, and other site concrete improvements.
Featured Projects
Cottonwood Creek Brewery | Hutto, Texas
General Contractor: Engen Contracting Inc.
HR Marc completed the site concrete package for this ground-up commercial brewery project, including a 7,000-square-foot slab-on-grade foundation, 4,700 square feet of sidewalks, and 1,100 square feet of curb and gutter. The project also included the installation of ADA-compliant ramps, a transformer pad, light pole bases, concrete walls, and other site concrete improvements.
Volente Fire Station | Volente, Texas
General Contractor: Trimbuilt Construction Inc.
HR Marc completed the site concrete package for this ground-up fire station project, including a 10,500-square-foot slab-on-grade foundation, 7,200 square feet of concrete paving, and 4,100 square feet of sidewalks. The project also included the installation of ADA-compliant ramps, transformer and generator pads, bollards, a concrete headwall, a concrete drainage channel, and other site concrete improvements.